Capacity Requirements Planning ( CRP )

Capacity Requirements Planning (CRP)

🔧 Occurs at the level of the material requirements plan.
🔧 It is the process of determining in detail the amount of labor and machine resources needed to achieve the required production.

Input
☆ Needed for a CRP : open shop orders, planned order releases, routings, time standards, lead times and work center capacities and can be obtained from the following :

🌺 open order file
  1. An open shop order appears as a scheduled receipt on the material requirements plan.
  2. It shows all relevant information such as quantities, due dates and operations.
  3. It can be maintained manually or as a computer file.
  🌺 Material requirements plan
  1. Determined by the computer's MRP logic based upon the gross requirements for a particular part.
  2. In assessing the total capacity required in future time period.
          🌺 Routing File
  1.        Specified on a route sheet , or in a company-based system.
          🌺 Work center file
  1.        Composed of a number of machines or workers capable of doing the same work.
  2.     .  Contains information on the capacity and move, wait and queue times associated with the center.